Construction and Integrity Testing of the Drilled Shafts

Construction and Integrity Testing of the Drilled Shafts

Malcolm Drilling installed the drilled shafts from the existing grade using a Bauer BG46 drill rig with a 263-ft (80.2 metre) long Kelly bar. Since the overburden soil layers consisted of loose manmade fill, including old wooden piles, and several sand lenses to...