Tag Archives: Bauer

Construction and Integrity Testing of the Drilled Shafts

Malcolm Drilling installed the drilled shafts from the existing grade using a Bauer BG46 drill rig with a 263-ft (80.2 metre) long Kelly bar. Since the overburden soil layers consisted of loose manmade fill, including old wooden piles, and several sand lenses to depths of about 80 feet (24.4 metres), temporary…

ECA conducts first-ever BAUER Drilling Rig safety training

Equipment Corporation of America (ECA), a leading distributor of foundation construction equipment, held its first-ever BAUER OT-B Drilling Rig Operator’s Training from May 7-11 at its Coraopolis, Pa. headquarters. The course comes in the wake of the 100-year-old company being designated a regional training center for BAUER Foundation Equipment, a…

Building it Better – Baur applies technology to cost savings

Thanks to the internet, today’s consumer has a huge advantage when it comes to making a purchase. One or two clicks allows several options to appear on the screen. The identical product may offer several different prices, and perhaps free shipping, bonus points, or other consumer enticements to keep the…