Flashback: Saving the Calgary Zoo

The Calgary Zoo is located in the Bridgeland neighbourhood of Calgary, just east of the city’s downtown. It is accessible via light rail system, car, and bicycle/foot via the Bow River pathway. A large portion of the zoo is located on St. George’s Island in the Bow River. The zoo,…

Soilmec’s SR-65 EVO reaches new levels of performance and comfort

Provided by Soilmec North America Inc. The new Soilmec SR-65 EVO was designed with focus comfort, performance, versatility and safety, thanks to an impressive list of best in-class advantages and class-exclusive features. The SR-65 EVO does its best in LDP segmental casing technology and deep CFA piles. These targets are…

Liebherr THS 110 D-K crawler concrete pump especially suited to special civil engineering works

Concrete pump on a crawler running gear with a maximum delivery rate of 102 m³/h Particularly suited for job sites that involve frequent relocation around the construction site Radio remote control included as standard Intermat 2018 will see Liebherr introduce the THS 110 D-K crawler concrete pump, which offers a…

Construction and Integrity Testing of the Drilled Shafts

Malcolm Drilling installed the drilled shafts from the existing grade using a Bauer BG46 drill rig with a 263-ft (80.2 metre) long Kelly bar. Since the overburden soil layers consisted of loose manmade fill, including old wooden piles, and several sand lenses to depths of about 80 feet (24.4 metres), temporary…